• MANURE TANKS

    HÖRMANN INTERSTALL GMBH OFFERS YOU: MANURE TANKS
  • MANURE TANKS

    HÖRMANN INTERSTALL GMBH OFFERS YOU: MANURE TANKS
  • 1
  • 2

MANURE TANK


Nowadays, time is the deciding factor of every farmer. Therefore, large-area formwork on the construction site is indispensable. With our tried, tested and repeatedly improved formwork system we facilitate the work processes. Formwork elements up to 430 cm in height are moved by a mobile crane from our company. The ceiling formwork brought along is quick and easy to install. An optimal ceiling load is achieved by means of a 'mushroom' column.

Also available only in Austria:

- external formwork and internal formwork (large-area formwork)

- Bricklayer and truck driver with crane

- ceiling formwork

- Column formwork, iron section

- sealing tape

- Formwork accessories

- Formwork transport

- Ceiling load 2.5 t, block load (truck passable 40 t)

- 1x ceiling opening 200 x 100/110 cm

Vertrieb Oesterreich

Sales via HÖRMANN Interstall GmbH & Co. KG
Bahnhofstraße 17 | A-3352 St.Peter / AU

- Easy operations with four different formwork systems
- 3 m to 34 m in diameter
- 10 m to 3600 m³ capacity
- Formwork elements up to 430 cm in height
- Ceiling formwork for passable ceilings
- Optimal ceiling load by means of 'mushroom' column

 


 

The following dimensions are possible

- System 1: Formwork in boxes of 3-9 m diameter
- System 2: large area formwork of 7-11 m diameter
- System 3: XL formwork of 12-14 m diameter
- System 4: Formwork of 16-37 m

Guellebehaelter (2)


OUR MANUFACTURING DEPTH PROMISES
PERFECT QUALITY AND LONGEVITY

 

Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
Ok